Bathroom Remodel – Update!

It has officially been over a year since I started my bathroom update…whew! I planned to have it done by this point, but I can only do the work on weeknights and weekends, there turned out to be a lot more wrong than I originally thought, and I’ve been working full-time and raising a toddler at the same time.

You can track everything I do (successes and failures) at: https://youtube.com/@PeterGoodall

Here’s a brief overview video of how things look today:

I would cautiously estimate that I have more done work done than I have remaining to do. Some of the remaining tasks include:

  • Finishing the shower wall tiling, including around the recessed glass block window
  • Laying the floor tile
  • Installing the toilet
  • Installing the vanity
  • Drywall mudding, including patching over-sized holes and painting the walls

Thank you again for following me on this journey!